ai.ServiceManager
Organization pending Hive contextNo identity
Sample dataSample data — illustrative only. No PSA or Hive services are connected.
← Ticket Success

Site-to-site VPN down between HQ and plant

Branch connectivity outage affecting production floor systems. Likely edge device or tunnel policy, not carrier.

SD-48211P2Intervention requiredUpdated 41 minutes ago
Success score
41/100
SLA consumed
87%
78m of 90m
Client
Northwind Manufacturing
Technician
Dana Whitfield

Success risk

  • No technician update in 41 minutes
  • Escalation threshold in 12 minutes
  • Assigned technician holds two other active P2 tickets

Recommended next actions

Decision receipts, not model reasoning.

Approval requiredhigh confidenceHuman decision

Recommended: Add Kevin Alvarez as secondary resource.

Why
  • SonicWall capability: strong
  • Currently available
  • Client familiarity: high
  • Ticket approaching SLA risk
Bounded executionmoderate confidence

Recommended: Post the CHG-2291 rollback steps to the ticket.

Why
  • Prior identical incident resolved in 18 minutes with these steps

Hypotheses

Working explanations with supporting signal.

  • Phase 2 policy mismatch after firmware upgrade
    Matches SD-47755 signature and CHG-2291 timing.
  • Upstream carrier fault
    Lower likelihood — LAN-side monitoring at the plant is reporting normally.

Decision history

Auditable record of every action taken.

  1. 78 min agoService ManagerTriaged as P2 network outageRouted to network queue
  2. 74 min agoDana WhitfieldAccepted assignmentDiagnostics started
  3. 12 min agoGuardianRaised to interventionAwaiting dispatcher decision
Buddy Bee · awaiting Hive integration

This ticket is off the expected path. Do you want more time, another set of eyes, or an escalation?

Relevant context

Changes, projects, prior tickets and documentation.

  • changeCHG-2291 firewall firmware upgrade
    Applied 2 days ago to NW-EDGE-02
  • ticketSD-47755 tunnel flap after upgrade
    Resolved by rolling back IKE policy
  • documentNorthwind network runbook
    Section 4: tunnel recovery steps
  • projectPRJ-118 SD-WAN migration
    Cutover scheduled in 3 weeks

Retrieval and documentation intelligence will be provided by Hive knowledge services.